DSI Post-Tensioning Loop Tendon resolves contractor's one-end access dilemmaAlameda Street Grade Separation Bridge, Los Angeles, CA, USAThe bridge is part of the recently finished, $2.4-billion Alameda Corridor, a rail cargo expressway that connects the city of Los Angeles with the nation's largest port: Los Angeles-Long Beach. The corridor is only 32 km in length but is very environmental and financial beneficial to the communities along the corridor because it eliminates traffic congestion (200 at grade roadway crossings were eliminated) and reduces transportation time from three hours to 30 minutes. |

